All citiesSan FranciscoClevelandNew York CityWashington, D.C.CincinnatiLos AngelesOaklandSan Diego
Seattle and Austin coming October 1st.

Los Angeles · guides

For anyone deciding what to be told each morning

What Los Angeles files every day

Fifteen lists from five LADBS feeds, keyed on the day a permit was issued rather than the day it was asked for. What each is, and why the issue date.

Fifteen lists, five feeds, the issue date

Los Angeles publishes one permit feed, from the Department of Building and Safety, about a week behind. Every list here is cut from it by the city's own permit type, and every one is keyed on the day the permit was issued: a filed permit is a plan, an issued one is a job that may start tomorrow. They arrive at 6:30am Pacific, and you choose which.

The other end of the permit

The department also publishes the certificate that ends a job: the sign-off that the work passed and the building may be used. Two lists are cut from that feed, which runs about two weeks behind, measured. A third comes from the vacant-building abatement register.

The trades, from the trades' own feeds

The department publishes its electrical permits as their own feed, and its mechanical feed carries plumbing, HVAC, fire-sprinkler, elevator and pressure-vessel permits as permit types. Six lists are cut from those two, and they are what the Trade plan carries in Los Angeles.

Not here, and why: code-enforcement cases publish no geometry and no date a list could honestly sort by, so they are read per parcel in the report instead. 311 is not on the city's live portal. Neither is faked.

Counts run 4 September 2026.

More Los Angeles guides