Cincinnati · guides

For anyone pricing or chasing work here

The five trades Cincinnati files separately

HVAC, plumbing, fire protection, elevator and excavation each have their own permit type here, which is why a trade can watch its own work in this city and cannot in Cleveland.

This city files five trades as their own permit types. Cleveland files “Building Permits” and nothing finer, which is why the trade plan exists here and has no Cleveland counterpart.

The five, and what each is worth watching for

Two more that tell you a block is about to change

Wrecking permits, 5,730 of them, are demolition made public: on a block about to change, the wrecking permit is usually filed first. Sign permits, 4,700, are the cheapest early signal that a storefront has changed hands — a sign permit is a tenant.

Issued is not filed

These lists are dated by the day the permit was issued, not the day it was applied for. A permit with no issue date has been applied for and not granted, which is a different fact from work that may legally start, and the report counts the two apart rather than adding them.

The declared cost is a floor

Most rows in this feed carry no cost at all, and where one exists it is what the filer told the city the work was worth, which sets fees. Treat it as a floor rather than as an estimate of the job, and note that a total across a parcel is a total over the permits that carry a figure, not over all of them.

Counts run 7 September 2026.